project
University of Houston – Cougar Baseball Field
More Info
project
University of Houston – Cougar Baseball Field
More Info
project
University of Houston – Cougar Baseball Field
More Info
project
University of Houston – Cougar Baseball Field
More Info

University of Houston – Cougar Baseball Field

Client: University of Houston
Market:
Sports + Events
Higher Education
Discipline: Architecture + Interiors
Project Area: 20,000 sq. ft.

The University of Houston received full architectural and civil engineering renovations including the design and installation of a synthetic turf system to the existing natural turf, utilizing a rubber/sand-infilled turf system. Demolition and disposal of excavated field materials from existing natural turf field included the removal of the existing irrigation system within the field. A storm water detention was incorporated into the free-draining stone base to mitigate the increased run-off from the synthetic turf field. Additionally, chemical stabilization of the sub-grade beneath the field was conducted as well as the connection of a sub-drainage system to the existing drainage outlet.
Share this story

Client: University of Houston
Market:
Sports + Events
Higher Education
Discipline: Architecture + Interiors
Project Area: 20,000 sq. ft.

University of Houston – Cougar Baseball Field

The University of Houston received full architectural and civil engineering renovations including the design and installation of a synthetic turf system to the existing natural turf, utilizing a rubber/sand-infilled turf system. Demolition and disposal of excavated field materials from existing natural turf field included the removal of the existing irrigation system within the field. A storm water detention was incorporated into the free-draining stone base to mitigate the increased run-off from the synthetic turf field. Additionally, chemical stabilization of the sub-grade beneath the field was conducted as well as the connection of a sub-drainage system to the existing drainage outlet.